BP Oil Refinery Central Control Room
CLIENT
BP Refinery
LOCATION
Kwinana
VALUE
$6 million
TYPE
Construct only
The new central control building was built adjacent to the existing facility, which remained operational during construction to avoid disrupting refinery operations.
The project involved:
Single-storey concrete structure extension
Large volume of concrete pours for the raft and roof
Interlocking precast panel walls with structural steel bracing
Services infrastructure ready to receive fitout
Connection to the external sewer services system
External paving and access enablement works
Internal fitout of stud wall/glazed partitioning, suspension acoustic tile ceilings
Reticulation of services to suit fitout requirements
Fire-rated ceilings to critical defined areas
Services fitout and commissioning