A new performing arts building complete with full back and front of stage facilities sound proof music rooms and teaching areas. The auditorium seats 500.
The contract required major design input and careful construction methodology to erect the rear slanting precast concrete panels of the Auditorium which were at a 5:1 pitch. With both structural steel and mezzanine concrete suspended slab interfacing with these panels, the final construction sequence was impressive.